Freestyle Bicycle:
SY-BM20119
Frame: HI-Ten Tube (TT) 21″ leading tube length
Fork:20″ Hello-10
Handlebar: Hello-10 1″TH
Stem: FRAMED ALUMINUM FRONT LOAD
Chain wheel : Kencycle spacely desige metal ½”*one/8“* 25T
Hub: Aluminum
Free of charge wheel:½”*one/eight“* 9T
Brake: R: u- brake
Rim :twenty”*1.seventy five” Doudle Wall Aluminum
Crack set: Three-PCS Cr-Mo CRANK 170mm
Bottom Braket : ONE Laptop CRANK
Pedals: P P Physique Pedals ,
Brake levers : Promax Aluminum LEVER .w/reach change
Brakes: Promax 907 U-brake Rear .
SPC | Seller | Ingredient | Element CZPTR |
DECAL/Name PLATE | BLUESKY | WATER TRANSFER DECAL | |
Body | KENCYCLE | twenty INCH HI-TEN (TT) 21″ prime tube duration , | PAINTI NG |
FORK | KENCYCLE | THREADLESS 1-1/8″ Hi-10 | Painting |
HEAD Established | FPD | HEAD SET THREADLESS 1-1/eight” | BLACK |
HEADSET SPACERS | NECO | ALLOY BLACK | BLACK |
Prime CAP/STAR NUT | NECO | TOP CAP W/STAR NUT | BLACK |
SPROCKET/SPIDER | CW | CHUAN WEI Product one/8″x25T ALLOY CHAINRING | SU |
CRANK Established | CW | 1PC 6-1/two” Very hot Solid CRANK | BLACK |
BB-Set | CW | B.B Elements 9PCS | BLACK |
HANDLEBAR | EVG | BMX Hbar eight” Rise Hello-10 | MATTE BLACK |
STEM | EVG | 28.6*55MM EXT BAR BORE 22.2MM | BLACK |
GRIP | VELO | VELO GRIP 130MM Length | BLACK |
H/BAR Conclude PLUG | N/A | N/A | |
F/HUB | RT | Metal 3/8″x36H HI FLANGE | BLACK |
R/HUB | RT | STEEL 3/eight”MMx36H HIFLANGE W/9T DRIVE | BLACK |
Entrance RIM | SAM | SINGLE Wall rim. 20″*one.75″ | BLACK |
REAR RIM | SAM | SINGLE Wall rim. 20″*one.seventy five” | BLACK |
SPOKES | SLE | fourteen GAUGE Metal LACED 3 CROSS | BLACK |
Front TIRE/TUBE/STRIP | WANGDA | BK TUBE 20″X2.125″ A/V RIM STRIP 20″*16W | BLACK |
REAR TIRE/TUBE/STRIP | WANGDA | BK TUBE 20″X2.125″ A/V RIM STRIP twenty”*16W | BLACK |
F/BRAKE | NIL | ||
R/BRAKE | Promax | Promax BMX U-BRAKE | BLACK |
BRAKE LEVER | Promax | Promax Soften Forged alloy | BLACK |
BRAKE CABLE/CASING | LEE CHI | LEE CHI 2P 2C | BLACK |
ROTOR | NIL | ||
FREEWHEEL | RT | LMA-8 ½”*one/eight“*9T | BLACK |
CHAIN | KMC | KMC Z410A | BROEN |
CHAINGUARD | NIL | ||
SADDLE | VELO | PIVOTALASTIC NO FOAM AND NO Cover | BLACK CZPT |
SEAT Post | PREMETEC | ALLOY PIVOTAL Submit twenty five.four X 250MM | BLACK |
SEAT CLAMP | Promax | Promax MX-38-RT 31.8MM | BLACKANO JY-002 |
PEDALS | HY | HP-565 P.P Ball CZPT nine/16″ | BLACK |
CHAIN TENSIONER | PMT | Of course | |
PEGS | QH | Steel 38 *110MM Shade :ED 4PCS | ED |
REFLECTORS | CATEYE | AS Essential TO Meet CPSC Requirement WHITE WHEEL WHITE CZPT Facing Purple REAR FACING | |
MISC | N/A | N/A | |
F/REF. BRKT | YF | FOR HANDLEBAR CROSS BAR | BLACK |
R/REF. BRKT | YF | FOR SEAT Publish | BLACK |
F. AXLE Basic safety RET | BLACK | BLACK | |
BOLTS | SG | STAINLESS | BLACK |
Manual | AS Shopper Need | ||
PACKING Substance | CARDBOARD PAPER WRAP | ||
CARTON | 5 PLY EXPORT STHangCZPTRD | ||
Body/FORK End: | AS Order | PAINTI NG | |
HANDLEBAR Finish | AS Get | MATTE BLACK | |
PACKING | SKD 85% | 1SET/CARTON | |
CKD | A+B CARTON PACKING | ||
OEM | Body&FORK 4SETS/CARTON Relaxation Components OEM PACKING |
Geometry–SY-FS2090 | ||
one | CZPT Tube Angle | seventy four.5 |
two | Seat Tube Angle | seventy one |
three | Leading Tube Centre to Centre | 533 (21″) |
4 | Seat Tube to Leading | 225 (8.86″) |
five | Bottom Bracket Top | 296 (eleven.sixty five”) |
six | Chainstay Duration | 343 (13.five”) |
seven | Seat Post Diameter | twenty five.4 |
Our Services
- OEM service is welcome.
-
We will provide all the details to you during the mass production.
- CZPTize your mould according to your require.
- Your requirements are very highly regarded.
- Essential test and certification can be attained as you ask for.
FAQ:
1 . Q: Can I get some samples?
A: We are honored to provide you samples for good quality examine.
two. Q : How long can I receive my sample?
A: It typically normally takes 40 organization days for samples. If the dimension in stock, we will ship your merchandise immediately.
3. Q : What’s the MOQ?
A: The MOQ is 100 PCS.The shades can be mixed in 1 container,but the amount need to not significantly less than 75 PCS.
4. Q : How does your manufacturing facility do relevant quality manage?
A: Good quality is leading precedence. We connect excellent significance to quality management from the very beginning of production.
five. Q : What is actually the delivery time?
A:CZPTly speaking,it will get about 45days to end an order from MOQ to 40’HQ.But the extra time is according to your quantity.
6. Q : Can I thrust the shipping time?
A:Just like mother give delivery to baby, preterm child is not wholesome and need you take a lot more treatment for him.We consider for a longer time time producing best merchandise for you.
Do not hesitate to make contact with us if you have any questions.
Thank you!