D275 Track Roller Bottom Lower Roller Spare Parts Model No. 17m-30-00230 Bulldozer

D275 Track Roller Bottom Lower Roller Spare Parts Model No. 17m-30-00230 Bulldozer

D275 track roller bottom lower roller spare components model no. 17M-thirty-5710 bulldozer
Solution Info
CZPT Bulldozer Supprt Roller

Doder Observe Roller

D85 Bottom Roller

Dozer base roller

D65 decrease roller 

Solitary Track roller

Technical specs for crawler excavator monitor roller

Framework

wheel physique

35MnB/40Mn2/40MnB/50Mn

side include

QT500-7

shaft

45#

ring float

GLKBTCr16Mo2NiCu

O ring

rubber

Bimetal sleeve

CuPb10Sn10

Hexagon socket bolt

JB/T1000-1977

lubricating oil

forty#

The primary parameters

identify

keep track of roller/bottom roller/support roller/Decrease Roller

Part amount

7G571

Colour

Black or Yellow

Surface Hardness

HRC48-fifty four,deepth:4mm-10mm

Method

Forging&Casting

Warranty time

2000 hour (Typical life 4000hours   ) 

Certification

CZPT-9002

Shipping and delivery Time

In 25 times right after agreement established

Package deal

Fumigate seaworthy packing

three.Function:

one)Our monitor rollers are adopting by way of hardening program and spraying quenching technique although complying with the stringent ISO Technique.

two)We are ready to guarantee the part has exceptional put on resistance even in the most extreme operating circumstances

3)We are employing progress machining centre,horizontal and vertical CNC machining to execute processes these kinds of as machining, drilling, threading and milling to guarantee the qulity and precision of every single component to guarantee the precision of assembly dimensions. This is to increase the lifestyle span of every single component and minimize creation price for every hour.

four).Nicely lubricated oil recycle program

five). Large hardness :HRC52-58,deepth:8mm-12mm

six). Deep hardened use floor.

7). Excellent bronze bushings.

eight).Undercarriage parts stock photographs will send out just before order.

9).All components can check with component quantity,all components can purchase adhere to element quantity.

ten). Risk-free packing to protect the items, this kind of as wooden box,by tray.

eleven). Little amount can settle for.Sample buy also acknowledge.

twelve).Lifelong after-product sales services.

thirteen).Authentic /OEM /Soon after Marketplace top quality and competitive price-two.Versatile payment terms.

fourteen).Swift delivery time.

15).Exceptional agent approved.

sixteen).Have cooperated with numerous importers in us for far more than ten many years.

17) Great steel fibrous tissue.

eighteen) Resist abrasion and effect nicely.

19) Lengthy daily life-expectation.

20) Very good top quality and competitive value.

21)We can offer CZPT products with specific demands.

22)Products sizeFollow OEM strictl.

23). A single-stop support.

A.Total undercarriage components of excavator and bulldozer are CZPT: observe roller/base roller/lower roller, entrance loafer, sprocket rim/phase team,

provider roller/best roller, observe chain with sneakers/track team.

B.Excavator spring assembly with OEM size, bucket website link/H link, hyperlink rod/I website link, track guard.

C.Floor Engaging Equipment: bucket tooth, excavator buckets, reducing edge, and conclude bits

D.CZPT cylinder and seal kits: EX1200, PC1250 hydraulic cylinders are also CZPT.

25). Manufacturing facility direct value and Strict Quality Manage.

We have our very own factory and overseas investing workplace, connect a lot relevance to things top quality throughout the generation and usually examine each and every products ahead of delivering.

four.Rewards:

one). Top quality promise
two). CZPT support
3). Obtain distinct areas into one container 
four). Unobstructed communion 
five). Shipping Products in time 
six). LCL is acceptable
seven). OEM areas quantity advice
8). Creating in accordance to drawings.

9). We have sophisticated technoledge and one hundred% tests ahead of delivery.

ten). Rapid shipping and competitive cost.

eleven). The more substantial amount you purchase, the far better price and more quickly delivery we can source.

12). We have a skilled crew to offer expert provider for you.

13). We can offer utilized and new,OEM,great high quality manufactured in china areas to you.

14). The components will give fat,cost when quotation.

15). Real components stock pictures will send out before purchase.

16).All components can verify with portion number,all components can get follow component number.

seventeen). Protected packing to shield the products, such as picket box, Iron sheet for our areas.

eighteen).Tiny amount can settle for,Sample purchase also acknowledge.

19). 24 several hours oversea support.

twenty).1-cease getting services.

Total undercarriage parts of excavator and bulldozer are CZPT:
Keep track of roller/bottom roller/reduce roller, entrance loafer wheel assy, sprocket rim/segment team,
carrier roller/prime roller, observe chain with shoes/observe team/ Keep track of Adjuster/ Monitor Bolt&nuts

21). Give us appropriate model variety/machine serial quantity/ any numbers on the components alone. Or measure the elements give us dimension or drawing.

22).Entire world-class Good quality.

23).Manufacturing facility sale straight,with Affordable price.

24).We design and style and produce all the undercarriage areas adhere to authentic products strictly.
twenty five) Only High Top quality Elements Provided:
Say No to mixed various top quality parts, we only have a single high quality management regular on substance, production line and QC, our aim is to supply higher good quality areas at competitive price tag, to aid our consumers do long-phrase organization and less complicated following-sale services
 

Related Merchandise

Perform Approach

1) Do not oil and distort the rubber floating seal ring throughout assembling the rollers

2) A small quantity of oil must be lined/coated on the contact surface area although pressing the floating oil seal.

three) Soon after ending the assembling approach,fill in 80% of clean extreme-stress automobile equipment oil and confirm no leaking 4 hours later.

four) Observe roller, Lower roller,base roller,carrier roller, idler are mounted with extended lifestyle properly sealed Duo-cone floating ring well sealed Duo-cone floating ring seal.

Business Details

Package deal

After-sales Services
one) 24 several hours for right after-product sales service

2) Supply us image of using predicament,items,using information, then payment soon after everything is concluded in three doing work days.

three) Any declare thanks to the quality of products,the compensation is not a lot more than the price of the items that have top quality dilemma.

FAQ
Q1:Are you a trade or a manufacure?
    A:We are an industry and trade integration organization, our manufacturing facility situated on HangCZPT Nanan Distric.
Q2:How can I be confident the Excavator Areas will fit my excavator?
    A:Give us right design amount/device serial number/ any quantities on the parts  itself.Or measure the components give us dimension or drawing.
Q3:How about the payment terms for Excavator Areas?
    A:We generally accept T/T or L/C. other terms also could be negotiated.
Q4:What is your bare minimum order for Excavator Parts ?
    A:It is dependent on what you are purchasing. Normally, our bare minimum get is one particular 20′ full container and LCL container (considerably less than a container load) can be acceptable.
Q5:What is your delivery time for Excavator Elements ?
   A:FOB HangCZPT or any Chinese port : 25-30days . If there are any areas in stock ,our supply time is only 7-ten times. 
Q6:What about Top quality Manage?
   A:We have exceptional tester, check out every piece to guarantee the high quality is good,and rigid control to ensure solution safety into container.

Speak to Us

D275 Track Roller Bottom Lower Roller Spare Parts Model No. 17m-30-00230 Bulldozer